Orgiva – Benahadux line map
16-06-2020
The three maps show the power line they want to boost, starting in the Granadinos and Tíjola (map 1), continuing through Cerro Negro (map 2), Mancazuca and Zute (map 3) and ending at the Orgiva substation. The affected plots are marked within 100 m.